Hyload Hyproof Waterproofing Hyproof Waterproofing Hyload Hyproof Waterproofing Waterproofing coal tar coal tar Membrane Waterproofing Membrane Waterproofing
coal tar pitch coal tar pitch Green Roof
Designed to tackle the most demanding waterproofing requirements
Green Roof Root Barrier Root Barrier
Dampproofing Dampproofing Chemical Resistance
Chemical Resistance Elvaloy Elvaloy Elvaloy Elvaloy Below Grade Below Grade
coal tar pitch Elvaloy Elvaloy
Waterproofing

First and foremost, the green roof must be watertight and the waterproofing must be suited to the unique demands found in a vegetative environment. The waterproofing must be root resistant, chemically stable, and able to withstand ponding water. Waterproofing root resistance is tested using a 2 year greenhouse test developed by the German FLL. If the waterproofing has not been tested or has failed the root resistance test an additional root barrier is required.

Waterproofing Waterproofing
Hyload Waterproofing Systems — Phone: (330) 769-3546 - Toll Free: (800) 457-4056 - Fax: (330) 769-4153
Web Site Design and Web Site Hosting by Flash Avenue - York, PA